MIL-DTL-2/24D
OPTIONAL REQUIREMENTS:
1.
Outlet cap or plug (required) (not required).
2.
Wrench or key (required) (not required).
3.
Dip tube assembled to valve (required) (not required).
4.
Diameter of cylinder (inches).
INTENDED USE: The valves covered by this specification sheet are intended for use with
ethylene oxide cylinders.
NOTES:
1. Special requirements will be mandatory for all valve procurements.
2. Optional requirements will be specified for each valve procurement.
CHANGES FROM PREVIOUS ISSUE: Marginal notations are not used in this revision to
identify changes with respect to the previous issue due to the extent of the changes.
Custodians:
Preparing Activity:
DLA - GS3
Army - AT
Navy - SH
(Project 8120-1047-24)
Air Force - 68
Review Activities:
Army - AV
Navy - AS, MC, YD
2